{"id":9456,"date":"2020-06-03T15:35:22","date_gmt":"2020-06-03T15:35:22","guid":{"rendered":"http:\/\/tacambaro.gob.mx\/?p=9456"},"modified":"2020-07-17T15:40:47","modified_gmt":"2020-07-17T15:40:47","slug":"sct-inicia-trabajos-de-rehabilitacion-de-carretera-chupio-pedernales-gestion-de-chava-barrera","status":"publish","type":"post","link":"https:\/\/tacambaro.gob.mx\/?p=9456","title":{"rendered":"<h2><span style=\"color: #ffcc00;\"> SCT inicia trabajos de rehabilitaci\u00f3n de carretera Chupio \u2013 Pedernales; gesti\u00f3n de Chava Barrera. <\/span><\/h2>"},"content":{"rendered":"<p>\u2022\tTambi\u00e9n el H. Ayuntamiento bachear\u00e1 el tramo Tac\u00e1mbaro \u2013 Chupio para que la v\u00eda est\u00e9 en mejores condiciones en beneficio de miles de usuarios.<br \/>\nLa Secretar\u00eda de Comunicaciones y Transportes (SCT) dio inicio con los trabajos de rehabilitaci\u00f3n del tramo carretero Chupio \u2013 Pedernales, resultado de la gesti\u00f3n del Presidente Municipal, Ing. Salvador Barrera Medrano y en donde se contempla en una primera etapa el mejoramiento de 2.5 kil\u00f3metros.<br \/>\nChava Barrera reconoci\u00f3 que la citada v\u00eda de comunicaci\u00f3n, une a los municipios de Tac\u00e1mbaro y Turicato y por lo tanto es parte importante en la econom\u00eda regional, raz\u00f3n por la cual anunci\u00f3 que en breve el Ayuntamiento dar\u00e1 mantenimiento al tramo Tac\u00e1mbaro \u2013 Chupio ya que en algunos segmentos la carpeta muestra notable deterioro.<br \/>\nChava Barrera fue testigo de los trabajos, en donde cuadrillas iniciaron el d\u00eda de hoy con la limpieza de los taludes del tramo  Chupio &#8211; Pedernales, contempl\u00e1ndose que la pr\u00f3xima semana continuar\u00e1n con renivelaci\u00f3n de carpeta, bacheo profundo y superficial y aplicaci\u00f3n del riego de sello.<br \/>\nEl personal de la Secretar\u00eda de Comunicaciones y Transportes explic\u00f3 al Mun\u00edcipe los trabajos iniciados, asegurando que se buscar\u00e1 la asignaci\u00f3n de mayor cantidad de recursos para dar continuidad a la obra, ya que en esta primera etapa fueron asignados 2.5 millones de pesos.<br \/>\nEs importante mencionar que la citada v\u00eda de comunicaci\u00f3n no recibe rehabilitaci\u00f3n desde hace m\u00e1s de diez a\u00f1os y por el deficiente estado era muy solicitada la reparaci\u00f3n por la ciudadan\u00eda, raz\u00f3n por la cual semanas atr\u00e1s Chava Barrera se reuni\u00f3 con Roberto Espinosa Quintino, Director General del Centro SCT en Michoac\u00e1n, para la gesti\u00f3n de la obra.<br \/>\nCon ella se ver\u00e1n beneficiados directamente miles de usuarios, quienes diariamente recorren la v\u00eda  para realizar actividades comerciales y agr\u00edcolas, y en temporada de zafra es transitada por veh\u00edculos pesados para el traslado de la ca\u00f1a y el az\u00facar, y al carecer de mantenimiento por varios a\u00f1os, persisten los baches y segmentos en mal estado que han ocasionado accidentes.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2022 Tambi\u00e9n el H. Ayuntamiento bachear\u00e1 el tramo Tac\u00e1mbaro \u2013 Chupio para que la v\u00eda est\u00e9 en mejores condiciones en beneficio de miles de usuarios. La Secretar\u00eda de Comunicaciones y Transportes (SCT) dio inicio con los trabajos de rehabilitaci\u00f3n del tramo carretero Chupio \u2013 Pedernales, resultado de la gesti\u00f3n del Presidente Municipal, Ing. Salvador Barrera&hellip;<\/p>\n","protected":false},"author":1,"featured_media":9457,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9456","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"rttpg_featured_image_url":{"full":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-scaled.jpg",2560,2143,false],"landscape":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-scaled.jpg",2560,2143,false],"portraits":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-scaled.jpg",2560,2143,false],"thumbnail":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-150x150.jpg",150,150,true],"medium":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-300x251.jpg",300,251,true],"large":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-1024x857.jpg",1024,857,true],"1536x1536":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-1536x1286.jpg",1536,1286,true],"2048x2048":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-2048x1715.jpg",2048,1715,true],"post-thumbnail":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-300x300.jpg",300,300,true],"futurio-single":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-4x4.jpg",3,3,true],"futurio-med":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-20x305.jpg",20,305,true],"futurio-thumbnail":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/07\/IMG_3704-160x120.jpg",160,120,true]},"rttpg_author":{"display_name":"H. AYUNTAMIENTO DE TACAMBARO","author_link":"https:\/\/tacambaro.gob.mx\/?author=1"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/tacambaro.gob.mx\/?cat=1\" rel=\"category\">Otras<\/a>","rttpg_excerpt":"\u2022 Tambi\u00e9n el H. Ayuntamiento bachear\u00e1 el tramo Tac\u00e1mbaro \u2013 Chupio para que la v\u00eda est\u00e9 en mejores condiciones en beneficio de miles de usuarios. La Secretar\u00eda de Comunicaciones y Transportes (SCT) dio inicio con los trabajos de rehabilitaci\u00f3n del tramo carretero Chupio \u2013 Pedernales, resultado de la gesti\u00f3n del Presidente Municipal, Ing. Salvador Barrera&hellip;","_links":{"self":[{"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/9456","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9456"}],"version-history":[{"count":1,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/9456\/revisions"}],"predecessor-version":[{"id":9458,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/9456\/revisions\/9458"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/media\/9457"}],"wp:attachment":[{"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9456"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9456"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9456"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}