{"id":9662,"date":"2020-08-14T15:39:57","date_gmt":"2020-08-14T15:39:57","guid":{"rendered":"http:\/\/tacambaro.gob.mx\/?p=9662"},"modified":"2020-09-14T15:50:10","modified_gmt":"2020-09-14T15:50:10","slug":"chava-barrera-inicia-construccion-de-centro-para-la-gestion-integral-de-los-residuos-solidos-urbanos","status":"publish","type":"post","link":"https:\/\/tacambaro.gob.mx\/?p=9662","title":{"rendered":"<h2><span style=\"color: #ffcc00;\">Chava Barrera inicia construcci\u00f3n de Centro para la Gesti\u00f3n Integral de los Residuos S\u00f3lidos Urbanos. <\/span><\/h2>"},"content":{"rendered":"<p>\u2022\tEs una obra de gran impacto y sin precedente, ya que por primera vez el municipio contar\u00e1 con un lugar adecuado para la disposici\u00f3n final de los desechos.<br \/>\n\u2022\tEn la primera etapa se invierten $ 6, 978,439.42 pesos, aportados por el Ayuntamiento.<br \/>\n    Luego de varios intentos y no ser concretado, el municipio de Tac\u00e1mbaro contar\u00e1 con un Centro para la Gesti\u00f3n Integral de los Residuos S\u00f3lidos Urbanos que permitir\u00e1 el adecuado tratamiento de los desechos, convirti\u00e9ndose en una obra sin precedente y de gran impacto social que conjunta voluntades ciudadanas, cuyo banderazo de inicio fue dado el d\u00eda de hoy por el Presidente Municipal, Ing. Salvador Barrera Medrano.<br \/>\n   \u201cEs una obra sin precedente\u201d, dijo el Mun\u00edcipe ya que terminar\u00e1 con la contaminaci\u00f3n por el deposito de basura a ras del suelo o su env\u00edo a Morelia o P\u00e1tzcuaro, esta \u00faltima generando gastos a la administraci\u00f3n municipal.<br \/>\n   En esta primera etapa de la obra, que se ejecuta con el respaldo del Ejido Pedernales,  se invierten recursos municipales por el orden de $ 6,978,439.42 centavos, la cual constar\u00e1 de la rehabilitaci\u00f3n del camino de acceso, caseta de control y vigilancia con toda la infraestructura para su adecuado funcionamiento, laguna de lixiviados, construcci\u00f3n de 150 metros lineales de cerco perimetral, construcci\u00f3n de celda de confinamiento de residuos, un   colector de lixiviados y una planta de separaci\u00f3n.<br \/>\n   Momento previo al banderazo de inicio de los trabajos, Chava Barrera aclar\u00f3 que no es un basurero a ras del suelo, sino un relleno sanitario que no contaminar\u00e1 ya que cumplir\u00e1 con las normas sanitarias, y por con contrario, generar\u00e1 empleo y derrama econ\u00f3mica para los habitantes de la regi\u00f3n de Pedernales.<br \/>\n   Acompa\u00f1ado de los Regidores Rafael Maldonado Sald\u00edvar y Reginaldo Anaya Gonz\u00e1lez, as\u00ed como del Director de Obras P\u00fablicas, Jes\u00fas Sierra Cornejo, el Edil pidi\u00f3 el apoyo de la ciudadan\u00eda para continuar separando la basura desde casa, ya que es fundamental para el funcionamiento del Centro.<br \/>\n   De igual forma, lament\u00f3 que el proyecto a pesar de estar validado no tuvo acceso a recursos federales a\u00fan cuando se tiene un fideicomiso, \u201cdesde el primer d\u00eda de mi gobierno empezamos a trabajar para hacer realidad el relleno sanitario, lamentablemente no hubo o\u00eddos que escucharan las necesidades de los tacambarenses, a pesar de la crisis econ\u00f3mica y de salud damos inicio con esta obra de gran impacto municipal\u201d, extern\u00f3.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2022 Es una obra de gran impacto y sin precedente, ya que por primera vez el municipio contar\u00e1 con un lugar adecuado para la disposici\u00f3n final de los desechos. \u2022 En la primera etapa se invierten $ 6, 978,439.42 pesos, aportados por el Ayuntamiento. Luego de varios intentos y no ser concretado, el municipio de&hellip;<\/p>\n","protected":false},"author":1,"featured_media":9663,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9662","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"rttpg_featured_image_url":{"full":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028.jpg",640,427,false],"landscape":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028.jpg",640,427,false],"portraits":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028.jpg",640,427,false],"thumbnail":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028-150x150.jpg",150,150,true],"medium":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028-300x200.jpg",300,200,true],"large":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028.jpg",640,427,false],"1536x1536":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028.jpg",640,427,false],"2048x2048":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028.jpg",640,427,false],"post-thumbnail":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028-300x300.jpg",300,300,true],"futurio-single":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028-4x4.jpg",3,3,true],"futurio-med":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028-20x305.jpg",20,305,true],"futurio-thumbnail":["https:\/\/tacambaro.gob.mx\/wp-content\/uploads\/2020\/09\/IMG_5028-160x120.jpg",160,120,true]},"rttpg_author":{"display_name":"H. AYUNTAMIENTO DE TACAMBARO","author_link":"https:\/\/tacambaro.gob.mx\/?author=1"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/tacambaro.gob.mx\/?cat=1\" rel=\"category\">Otras<\/a>","rttpg_excerpt":"\u2022 Es una obra de gran impacto y sin precedente, ya que por primera vez el municipio contar\u00e1 con un lugar adecuado para la disposici\u00f3n final de los desechos. \u2022 En la primera etapa se invierten $ 6, 978,439.42 pesos, aportados por el Ayuntamiento. Luego de varios intentos y no ser concretado, el municipio de&hellip;","_links":{"self":[{"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/9662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9662"}],"version-history":[{"count":1,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/9662\/revisions"}],"predecessor-version":[{"id":9664,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/9662\/revisions\/9664"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=\/wp\/v2\/media\/9663"}],"wp:attachment":[{"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tacambaro.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}